Field Location
FIELD LOCATION
  • Location: Absheron field is located offshore Azerbaijan in the Caspian Sea about 100 km southeast of Baku.
  • Contract Area: 747 km²
  • Water depths: 470 meters
  • EPS (Phase 1) reserves: 326 Mboe: 36 Bcm gas and 90 MMbbls condensate
ABD-001 Well
ABD 001 WELL

Based in Baku and operational since 1st August 2018, the Joint Operating Company of Absheron Petroleum B.V. (JOCAP) is a non-profit joint operating company, owned by SOCAR Absheron (35%), TotalEnergies EP Absheron B.V. (35%) and ADNOC (30%), and founded for the development and production of the Absheron gas-condensate offshore block in the Caspian Sea.

Address: 45A Khagani street, Baku AZ1010, Azerbaijan
Tel: +994 12 525 09 80
  • ABD-01 is the longest well drilled in the Azerbaijani sector.
  • Pipe-in-pipe technology used for the first time in Azerbaijan.
  • First unmanned EPS platform in the Azerbaijani Caspian Sea.
  • Gas for domestic use; condensate exported via BTC pipeline.
EPS Platform
EPS PLATFORM
  • PSA signature: February 2009
  • Discovery & Commerciality: June 2012
  • Investment Decision: July 2018
  • End of ABD-01 drilling: 10 Nov 2019
  • First Gas: July 2023
  • Daily Production: 4.3 Mcm gas & 12000 bbls condensate
JOCAP Team
JOCAP TEAM